- Location:4600 Carothers Parkway Franklin, Tennessee
- EOR:Latta Structural Engineers, LLC
- Precaster:Tindall Corp.(Georgia)
- Specialty Precast Engineer:Consulting Engineers Group (Texas)
- Architect:Davis-Stokes Collaborative P.C. Architects
- Contractor:Skansa USA Building
Precast panels for the Peak 10 Data Center have much architectural detail.
Erected in 2015.