- Location:St Louis, Missouri
- EOR:Alper Audi, Inc.
- Precaster:St. Louis Prestress, Inc. and MidAmerica Prestress, inc.
- Specialty Precast Engineer:The Consulting Engineers Group, Inc. - TX
- Architect:The Lawrence Group
- Contractor:J.S. Albereci Construction Co. Inc.
The SSM Saint Mary's Health Center Parking Garage was erected in 2003.